Production of Loom:
The production of a loom mainly depends on the speed of the loom. Higher speed does not always mean higher production because if it exceeds a certain limit, loom stoppages due to excessive warp breakages occurring. As a result of higher speed may even reduce the production to a considerable extent. Other factors which affect production are picks inserted per inch of the cloth, quality of the warp and weft, type of loom i.e plain, dobby, jacquard, automatic, etc. types of organization i.e 2- loom system or 4- loom system, size of weft package, type of weft package. In this article, we will discuss the Loom Calculation Formulas in Weaving.
Different Formulas of Loom Calculation in Weaving
1. Production (calculated) in yds/hr,
….Picks per min × 60
= …………………………..
….Picks per inch × 36
….Picks per min
= ……………………. × 1.667
….Picks per inch
2. Production (actual) in yds/hr,
= Calculated production × efficiency
….Picks per min × 60
= …………………………..× efficiency
….Picks per inch × 36
….Picks per min
= …………………… × efficiency × 1.667
….Picks per inch
Example 01:
Calculate the production per hour of a loom running at a speed of 192 r.p.m. with an efficiency of 75%. The number of picks inserted per inch in the cloth is 80.
Solution:
Calculated Production per hour,
….Picks per min × 60
= ……………………………
….Picks per inch × 36
…..192 × 60
= ………………
……80 × 36
= 4 yds
So, the calculated Production per hour is 4 yds.
And,
Actual production per hour,
= Calculated production × efficiency
= 4 × 75%
= 3 yds.
So, the Actual production per hour is 3 yds.
3. The time required to complete a weaver’s beam,
….Length in yds of cloth from the beam
= ………………………………………………………. (1)
……Production in yds of cloth per hour
….[(Length in yds of warp – uptake) – waste of warp in yds) × Picks per inch × 36 ]
= ………………………………………………………………………………………………..……………………. (2)
………………………………Picks per min × 60 × efficiency
Example 02:
Calculate the time required to complete a weaver’s beam having 1000 yds of warp on it. The woven cloth is required to have 50 picks per inch. The up-take of warp in weaving Is 6% and the waste may be taken as 6 yds. The loom is running at 200 r.p.m and the efficiency is 75%.
Solution:
The time required to complete a weaver’s beam,
…Length in yds of cloth from the beam
= ……………………………………………………… (1)
…..Production in yds of cloth per hour
Now,
Length in yds of cloth from the beam = (Length in yds of warp – uptake) – waste of warp in yds
= (1000 × 96%) – 6
= (1000 × 9.6) – 6
= 934 yds.
And,
Production in yds of cloth per hour,
…..Picks per min × 60
= ……………………………. × efficiency
….Picks per inch × 36
….200 × 60 × 75
= ……………………
……..50 × 36
= 5 yds.
So, from (1), we have
The time required to complete a weaver’s beam,
……934
= …………
……..5
= 186.8 hours.
So, Time required to complete a weaver’s beam is 186.8 hours.
DEAR SIR,
I M LOOKING TERRY TOWELS AND BATHROBES WEAVING CALCULATION PLZ ADVISE.
BEST REGARDS